Renovations across the Barcelona metropolitan area 934 59 93 44info.clientes@fertech.esESCAEN
Real project · Full renovation in Barcelona

An 85 m² flat, from bare brick to the final detail

Full renovation of an 85 m² flat in Barcelona, completed in 3 months with a single project lead from start to finish. Here is the bathroom: we started from bare brick and rebuilt it from top to bottom.

Location
Barcelona
Size
85 m²
Works
3 months
Type
Full renovation
The same bathroom before the renovation, stripped back to bare brick with the floor still to be redone
01

The starting point

Bare brick walls, exposed pipes and a floor to be redone. Before touching anything, we measured and agreed the layout.

02

The works

Marble-effect finish from floor to ceiling and a low blue-tiled wall that separates the shower from the rest of the room.

Bathroom during the works, with the marble-effect wall finish in place
View of the finished bathroom towards the door, with a tall cabinet and the washbasin
03

The layout

Washbasin, shower and storage, each in its place. A tall cabinet makes use of the space beside the door.

04

The details

LED-lit mirror, glass shower screen and a stone-effect floor that hides everyday wear.

Detail of the washbasin, the lit mirror and the shower
Bathroom renovated by FERTECH: black vanity unit, LED-lit mirror, glass shower screen and a blue tiled wall
The same bathroom before the renovation, stripped back to bare brick with the floor still to be redone
BeforeAfter
Real project · 85 m² flat in Barcelona

From this… to this.

The bathroom of an 85 m² flat in Barcelona that we fully renovated in 3 months. Same space, before and after: slide to compare.

What this project includes

  • Shower with glass screen
  • Low wall in handmade-look blue tiles
  • Marble-effect walls from floor to ceiling
  • Grey stone-effect floor
  • Matt black vanity unit with drawers
  • LED-lit mirror
  • Tall storage cabinet
The project in 20 secondsSilent video. Tap to play.

Want to renovate your flat or bathroom?

Tell us what you want to change and we'll give you an itemised quote around 48 hours after the visit, with a written handover date.

More projects coming soon.